| Millennium Bridge | |
|---|---|
![]() The bridge seen from a restaurant in the Tate Modern gallery. St. Paul's Cathedral is across the river. |
|
| Official name | London Millennium Footbridge |
| Carries | Pedestrians |
| Crosses | River Thames |
| Locale | London, England |
| Maintained by | Bridge House Estates, City of London Corporation |
| Engineering design | Arup |
| Design | Suspension Bridge |
| Total length | 370 metres (1,214 ft) |
| Width | 4 metres (13 ft) |
| Longest span | 144 metres (472 ft) |
| Opened | 10 June 2000 |
| Coordinates | 51°30′37″N 0°05′54″W / 51.510173°N 0.098438639°WCoordinates: 51°30′37″N 0°05′54″W / 51.510173°N 0.098438639°W |
The Millennium Bridge, officially known as the London Millennium Footbridge, is a steel suspension bridge for pedestrians crossing the River Thames in London, England, linking Bankside with the City. It is located between Southwark Bridge (downstream) and Blackfriars Railway Bridge (upstream). The bridge is owned and maintained by the Bridge House Estates, a charitable trust overseen by the City of London Corporation. Construction of the bridge began in 1998, with the opening on 10 June 2000.
Londoners nicknamed the bridge the "Wobbly Bridge" after participants in a charity walk on behalf of Save the Children to open the bridge felt an unexpected, and, for some, uncomfortable, swaying motion on the first two days after the bridge opened. The bridge was closed later that day, and after two days of limited access the bridge was closed for almost two years while modifications were made to eliminate the wobble entirely. It was reopened in 2002.
The southern end of the bridge is near Globe Theatre, the Bankside Gallery and Tate Modern, the north end next to the City of London School below St Paul's Cathedral. The bridge alignment is such that a clear view of St Paul's south facade is presented from across the river, framed by the bridge supports.
The nearest London Underground station is Mansion House.
Contents |
The design of the bridge was the subject of a competition organized in 1996 by Southwark council and RIBA Competitions. The winning entry was an innovative "blade of light" effort from Arup, Foster and Partners and Sir Anthony Caro. Due to height restrictions, and to improve the view, the bridge's suspension design had the supporting cables below the deck level, giving a very shallow profile. The bridge has two river piers and is made of three main sections of 81 metres (266 ft), 144 metres (472 ft) and 108 metres (354 ft) (North to South) with a total structure length of 325 metres (1,066 ft); the aluminium deck is 4 metres (13 ft) wide. The eight suspension cables are tensioned to pull with a force of 2,000 tons against the piers set into each bank — enough to support a working load of 5,000 people on the bridge at one time.
Ordinarily bridges across the River Thames require an Act of Parliament. For this bridge that was avoided by the Port of London Authority granting a licence for the structure and the obtaining of planning permissions from the City of London and London Borough of Southwark.[1] Construction began in late 1998 and the main works were started on 28 April 1999 by Monberg Thorsen and Sir Robert McAlpine.[2] The bridge was completed at a cost of £18.2M (£2.2M over budget), primarily paid for by the Millennium Commission and the London Bridge Trust.[3] It opened on 10 June 2000 (two months late).
Unexpected lateral vibration (resonant structural response) caused the bridge to be closed on 12 June for modifications. Attempts were made to limit the number of people crossing the bridge. This led to long queues but dampened neither public enthusiasm for what was something of a white-knuckle ride, nor the vibrations themselves. The closure of the bridge only two days after opening attracted public criticism of it as another high-profile British Millennium project suffered an embarrassing setback, akin to how many saw the Millennium Dome. The wobble was attributed to a hitherto unknown phenomenon whereby pedestrians crossing a bridge that has a lateral sway have an unconscious tendency to match their footsteps to the sway, thereby exacerbating the sway. The tendency of a suspension bridge to sway when troops march over it in step was well known, which is why troops are required to break step when crossing such a bridge.
The bridge was temporarily closed on 18 January 2007, during the Kyrill storm due to strong winds and a risk of pedestrians being blown off the bridge.[4]
The bridge's movements were caused by a 'positive feedback' phenomenon, known as synchronous lateral excitation. The natural sway motion of people walking caused small sideways oscillations in the bridge, which in turn caused people on the bridge to sway in step, increasing the amplitude of the bridge oscillations and continually reinforcing the effect.[5] On the day of opening the bridge was crossed by 90,000 people, with up to 2,000 on the bridge at any one time.
Resonant vibrational modes due to vertical loads (such as trains, traffic, pedestrians) and wind loads are well understood in bridge design. In the case of the Millennium Bridge, because the lateral motion caused the pedestrians loading the bridge to directly participate with the bridge, the vibrational modes had not been anticipated by the designers.
The lateral vibration problems of the Millennium Bridge are very unusual, but not entirely unique.[6] Any bridge with lateral frequency modes of less than 1.3 Hz, and sufficiently low mass, could witness the same phenomenon with sufficient pedestrian loading. The greater the number of people, the greater the amplitude of the vibrations. For example, Albert Bridge in London has a sign dating from 1973 warning soldiers to break step while crossing.[7] Other bridges which have seen similar problems are:
After extensive analysis by the engineers [1], the problem was fixed by the retrofitting of 37 fluid-viscous dampers (energy dissipating) to control horizontal movement and 52 tuned mass dampers (inertial) to control vertical movement. This took from May 2001 to January 2002 and cost £5M. After a period of testing, the bridge was successfully re-opened on 22 February 2002. The bridge has not been subject to significant vibration since. In spite of the successful fix of the problem, the affectionate "wobbly bridge" epithet remains in common usage amongst Londoners.[9][10]
An artistic expression of the higher-frequency resonances within the cables of the bridge were explored by Bill Fontana's 'Harmonic Bridge' exhibition at the Tate Modern museum in mid-2006. This used acoustic transducers placed at strategic locations on the cabling of the Millennium Bridge and the signals from those transducers were amplified and dynamically distributed throughout the Turbine Hall of the Tate by a programme which Fontana entered into the sound diffusion engine of the Richmond Sound Design AudioBox [2].
In the 2009 film Harry Potter and the Half-Blood Prince, the Millennium Bridge replaces the Brockdale Bridge (a fictitious bridge in the Harry Potter universe) that is destroyed and subsequently collapses due to an attack by Death Eaters.
| Wikimedia Commons has media related to: London Millennium Bridge |
|
||||||||
|
||||||||
|
||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
sensagent's content
Dictionary and translator for handheld
New : sensagent is now available on your handheld
Advertising ▼
Webmaster Solution
Alexandria
A windows (pop-into) of information (full-content of Sensagent) triggered by double-clicking any word on your webpage. Give contextual explanation and translation from your sites !
SensagentBox
With a SensagentBox, visitors to your site can access reliable information on over 5 million pages provided by Sensagent.com. Choose the design that fits your site.
Business solution
Improve your site content
Add new content to your site from Sensagent by XML.
Crawl products or adds
Get XML access to reach the best products.
Index images and define metadata
Get XML access to fix the meaning of your metadata.
Please, email us to describe your idea.
Lettris
Lettris is a curious tetris-clone game where all the bricks have the same square shape but different content. Each square carries a letter. To make squares disappear and save space for other squares you have to assemble English words (left, right, up, down) from the falling squares.
boggle
Boggle gives you 3 minutes to find as many words (3 letters or more) as you can in a grid of 16 letters. You can also try the grid of 16 letters. Letters must be adjacent and longer words score better. See if you can get into the grid Hall of Fame !
English dictionary
Main references
Most English definitions are provided by WordNet .
English thesaurus is mainly derived from The Integral Dictionary (TID).
English Encyclopedia is licensed by Wikipedia (GNU).
Copyrights
The wordgames anagrams, crossword, Lettris and Boggle are provided by Memodata.
The web service Alexandria is granted from Memodata for the Ebay search.
The SensagentBox are offered by sensAgent.
Translation
Change the target language to find translations.
Tips: browse the semantic fields (see From ideas to words) in two languages to learn more.
last searches on the dictionary :
computed in 0.047s